CLIENT:
Hyundai Engineering Co., Ltd.
Project:
Turkmenistan National Institution
Location:
Turkmenbashy / Turkmenistan
Status:
Completed
Work Scope:
Mechanical Systems Engineering, Procurement, Fabrication, Construction
Type of Facility:
Commercial/Military Building
Total Facility Area:
40 000 m2
Contract Period:
6 month
Gas Supply System:
Construction, insulation, painting, casing of 1500 mt infrastructure line, G-4, G-10 counters, installation of SP-ARD Boxes, testing, commissioning
Boiler & Pump Rooms:
2 m3/h - 10 m3/h water softening system, liquid chlorine dosing units, booster pumps, expansion tanks 200lt, 10 bar – 300lt, 10 bar, Sewage Pump 220 v monofaze, inline circulation pumps with wet rotors, inline circulation pumps with dry rotors, stainless steel booster sets, main electrical pumps, port able water pumps, irrigation pumps, firefighting pumps
Fabrication:
Chimneys x 5, 600ø – 10 mt, fabrication, insulation, installation